The project assignment was to develop the Production feasible Technical Package 
I had bought the branded top of the brand : Allen Solly which was produced using Industry Standard Guidelines,observed the garment and analyzed the design, technical aspects, and BOM (Bill Of Materials) used in the garment. The BOM is produced is produced based on the given production process.
I have created a price sheet for 10,000 pieces of the proposed merchandise. The detailed Technical Package is designed to enhance the production process and effective outcome.
Sample Tech pack: Allen Solly for 10,000 Pieces
Technical Package
Published:

Technical Package

Published: